Client | JUDICO Ltd |
Project Name | Koderma Urban Water Supply Scheme |
Location | Koderma, Jharkhand |
Type of Project | Water Supply Project |
Nature of the Project | EPC Turnkey |
Project Value | 62.78 Crores |
Project Purpose
The Koderma Urban Water Supply Scheme, aligned with the Jal Jeevan Mission, is designed to efficiently collect raw water from Telaiya Dam, treat it at a dedicated Water Treatment Plant (WTP), and distribute clean drinking water directly to households. This initiative significantly enhances water accessibility, ensuring safe drinking water reaches thousands of residents across Koderma.
Project Deliverables
- Intake Well: Critical raw water sourcing structure constructed at Telaiya Dam, including comprehensive electromechanical installations for efficient water extraction.
- Approach Bridge: Constructed to ensure accessibility to the intake well, facilitating regular maintenance and operational activities.
- Raw Water Rising Main (RWRM): Ensures effective transportation of raw water to the WTP through carefully selected DI K9 pipelines.
- Water Treatment Plant (WTP): A dedicated 10 MLD WTP for the project utilizes advanced Rapid Sand Filtration technology for treatment, including components such as Aerator, Clariflocculator, Filter House, Chlorination Facility, Chemical House, and a Clear Water Reservoir to guarantee the safety of potable water.
- Clear Water Rising Main (CWRM): Efficiently transports treated water using high-pressure capable DI K9 pipelines, addressing current and future water demands.
- Elevated Service Reservoirs (ESRs): Strategically positioned reservoirs (at Barsotia Bar, Raja Talab, and Pandey Tola) operating via gravity to maintain adequate pressure and distribution throughout the network. The Capacity of the tanks being constructed ranges from 780KL to 980KL
- Distribution Network: Extensive HDPE pipeline network precisely designed to manage optimal water flow and pressure for household connections.
- House Service Connections (HSC): Robust household connection infrastructure providing reliable, tap-controlled water access. A total of 5,958 connections are being executed in the project.
- Electro Mechanical Works: The project requires us to install pumping machinery designed with high efficiency and reliability to manage varying water demands across extensive geographical and elevation ranges by helping in the movement of the fluid from one point to another.